Oct 21, 2019
Lanier Technical College LocationGainesville, Georgia ClientTechnical College System of Georgia (TCSG) Square Footage337,861 New South Construction worked with the Technical College System of Georgia (TCSG) and the Georgia State Financing and Investment Commission...
Sep 15, 2019
Schutz Container Systems Manufacturing Facility LocationCarl, Georgia ClientSchutz Container Systems Square Footage399,000 The internal functional arrangement of the manufacturing line was designed and constructed to maintain an orderly manufacturing sequence and the...
Sep 14, 2019
Surya Industrial Manufacturing Facility LocationWhite, Georgia ClientSurya Square Footage1,036,000 This project consists of a 1,036,000 sf distribution facility which includes a 50,000 sf two story office component with a project value of $25.5M. The project is...
Sep 13, 2019
Schutz Container Systems | Steel Drum Plant Location Houston, Texas Client Schutz Container Systems Square Footage 150,000 This project is approximately 150,000 sf tilt-up steel drum manufacturing facility that incorporates two bridge cranes, rail spur, soil...
Apr 15, 2019
Robins Air Force Base Building 125 LocationWarner Robins, Georgia ClientU.S. Army Corps of Engineers, Savannah District Square Footage250,000 Building 125 is a large aircraft hangar constructed in the early 1940s consisting of four large docks and high and low bay...